
Countertops, cut from one slab.
Kitchen counters, islands, waterfall edges, bar tops and vanity tops — the working surfaces of a home. We supply, cut and install the stone; your general contractor handles cabinetry, plumbing and appliances.
Stone Gallery
Explore the stones we work with.
A curated selection of natural stone for countertops, vanities, backsplashes, islands, stairs, floors, and wall cladding.
IT
IT
ES
ITProject gallery
Recent countertops — réalisations récentes.
We supply, cut and install the stone. Cabinetry, plumbing and appliances are handled by your general contractor or kitchen designer. We template directly on their built cabinets, fabricate at the workshop, and install once on site.














What's included
What we supply, cut and install. Adjacent trades — cabinetry, plumbing, electrical — sit with your general contractor.
- ·Kitchen countertops
- ·Islands & peninsulas
- ·Waterfall edges
- ·Bar & breakfast tops
- ·Vanity tops
- ·Eased · bullnose · mitred edges
- ·Cutouts for sinks & cooktops
- ·On-site templating & installation
Finishes & Edges
Choose the finish and the edge.
Finishes
Polished
Mirror surface, full saturation.
Honed
Soft matte, low reflection.
Leathered
Textured satin, hides marks.
Edges
Eased
Subtle softened arris — the everyday edge.
Bullnose
Full radius, kind to elbows.
Mitred
45° join — reads as a thick slab.
Waterfall
Continuous fall to the floor.
Process
From quarry to installation.
- 01.
Slab selection
You choose the slab at the showroom or via photo from our reserved stock.
- 02.
Template
We template on the installed cabinets — exact, never approximate.
- 03.
Fabrication
Cut, edged, polished and dry-fitted at the workshop.
- 04.
Installation
One visit. Sealed, joints matched, surfaces protected.
Good to know
The questions clients ask most often, before and after installation.
- Care & sealing
- Placeholder — describe your recommended sealing rhythm and the simple soap/water care routine. Note acid-sensitive stones.
- What we supply vs. your contractor
- Placeholder — we supply, fabricate and install the stone. Your general contractor handles cabinetry, plumbing, electrical and adjacent finishes.
- Lead time
- Placeholder — typical lead time from slab selection to installation, and when to lock the order in your build schedule.
- Repairs & rework
- Placeholder — describe our chip/repolish/replacement service and what's covered after install.
Working with contractors
